Metaltech SAFERSTACK Complete 2-Section High Tower Scaffolding System, Model Number M-MRT5710

1 418 240 CFA

Description

Product Details

  • SAFERSTACK frame stacks in 30% less space than regular frames, allowing the user to be more efficient when moving to and from the job site
  • Frames interlock for safer storage and transport, helping to prevent stacked frames from sliding
  • Scaffold frames have a durable, long lasting blue anti-slip textured powder-coat finish for superior grip and secure footing when climbing
  • Perimeter tubes 1-5/8in. O.D.13 ga. steel, interior tubes 1in.16 ga. steel
  • Pin spacing is 4ft., the industry standard that’s compatible with most scaffolding
Date First Available2021-03-25 19:27:14

Reviews

There are no reviews yet.

Be the first to review “Metaltech SAFERSTACK Complete 2-Section High Tower Scaffolding System, Model Number M-MRT5710”

Your email address will not be published. Required fields are marked *